01 · Solutions

Built for the whole hangar.

Eight roles, four ways training runs, one enforced chain. Pick your regulator and every role on this page speaks its language.

Working surfaceStage 02

Engineer

    ENGINEER · SAMPLE MRO ·B737NG№ 4482

    Pass a task without both a signature and a stamp.

    Pick a role. See their day.

    Each role gets its own working surface, and the system holds each one to its step. Pick a role to see what lands on their desk, what they sign, and what Air Fuse will not let them do.

    Working surfaceStages 01 and 02

    Trainee

    Lands on their desk

      What they sign

      SAMPLE MRO · TRAINEE ·B737NG№ 4482

      No sign-off step

      What the system will not let them do

        Four ways training runs.

        Most maintenance organisations run more than one. Air Fuse runs all four on the same chain, with the same signatures, the same review, and the same permanent record.

        01 Logbooks

        On-the-job training logbooks

        Every task executed with its evidence, signed by the trainee, then signed and stamped by the Engineer while the work is fresh. A logbook cannot move on to quality review with a single task open.

        • Evidence attached to the task it proves
        • Real-time signature and stamp, never a batch at shift end
        • Corrections go back to the trainee with the reason on record
        Logbook LB-0447B737NG · Chapter 32
        • 32-11-00Main gear shock strut servicingSealed
        • 32-31-00Gear extension and retractionSealed
        • 32-41-00Main gear retraction checkAwaiting Engineer
        • 32-42-00Brake wear checkReturned
        • 32-51-00Nose wheel steering testAwaiting Engineer
        38 of 52 tasks sealed

        02 Type training

        Initial, extension, renewal

        Each programme type runs its own sequence of assessment phases, set up the way your organisation assesses. A phase opens only when the one before it has passed, so nobody reaches the final sign-off by a side door.

        • Initial qualification, extension to a new aircraft type, renewal
        • Phases in a fixed order, each one passed on record
        • The same person can be initial on one type and renewal on another
        Programme typePhases run in order
        1. Phase 1Passed
        2. Phase 2Passed
        3. Phase 3In progress
        4. Phase 4Locked

        Initial qualification: 4 phases. Phase 4 opens when phase 3 passes.

        03 Competency

        Assessment and development plans

        Practical assessments scored competency by competency against the same criteria, with evidence captured in the room. A fail opens a development plan with the gap, the actions and a target date. Reassessment unlocks only when every action is done.

        • Structured scoring, not a pass or fail box
        • Question banks per aircraft type
        • Photo, video and audio evidence on the record
        Practical assessmentB737NG · bay 3
        Safety awareness
        Technical procedure
        Documentation discipline
        Not yet competentTechnical procedure below standard

        Development planTarget 2026-11-14

        • Supervised practice3 tasks
        • Torque data studyManual 32-41
        • Mentoring sessionA. Rahman

        ReassessmentLocked

        04 Currency

        Recurrent assessment and licence renewals

        Every licensed engineer carries a next assessment date. Reminders go out at 90 days and at 30 days, and again if it lapses. A renewal starts straight from the due list, with no logbook needed.

        • A due list for every licence holder: A, B1 and B2
        • Reminders to the engineer and the Training Officer
        • Assessment-only programmes for recurrent checks
        Due listToday 2026-09-22
        All 3 Within 90 days 1 Within 30 days 1 Overdue 1
        • M. HaddadB1 licence · B737NGDue in 84 days
        • K. TanB2 licence · A320Due in 21 days
        • J. OkaforA licence · ATR 72Overdue 3 days

        Reminders at 90 days, at 30 days, and again if it lapses.

        The evidence behind the signature.

        A signature says the work was done. These three say who was at the aircraft, how long the work really took, and whether every assessor holds the same standard.

        Hangar attendanceAt the aircraft

        Who was at the aircraft

        Trainees check in and out of the bay with a QR code. Every task shows whether they were on site when the work was signed, and quality review sees it beside the signature.

        • A. Rahman checked inBay 3
        • K. Tan checked inBay 1
        • A. Rahman checked outBay 3

        32-41-00 signed 09:14:08

        On site

        No scan? A manual entry witnessed by the Engineer the same day, flagged on the record.

        Experience hoursAttested, not claimed

        Hours that count

        The trainee logs the time on each task. The Engineer attests it when they sign, or corrects it with a reason, and only attested hours count toward the programme's target.

        412.5of 600 hours

        On pace
        • 32-41-003.5 h claimed3.5 h attested
        • 29-11-004.0 h claimed3.0 h, reason given

        Pace against the target shows who is falling behind while there is still time to fix it.

        Assessor calibrationSame case, scored blind

        Assessors, calibrated

        Assessors score the same recorded case blind. Each sees how far they sit from the benchmark only after they submit, and anyone drifting is flagged for recalibration.

        Case · B737NG main gear retraction

        • S. PereiraCalibrated
        • D. BrandtWatch
        • Y. SatoRecalibrate

        Run by the QA Officer. The benchmark stays hidden until each assessor has submitted.

        The whole hangar on one screen.

        Where every trainee sits on the chain, what is waiting on whom, and what is about to lapse. No spreadsheet to rebuild on Friday afternoon, and nobody chasing anybody.

        Training overview · Sample MROLive
        In progress
        23
        Waiting on a signature
        6
        In quality review
        4
        Due for renewal
        5

        01Assignment 0

          02Task and sign-off 0

            03Quality review 0

              04Assessment 0

                05Certificate 0

                  Every move on this board is a signature, a review or an assessment, recorded as it happens.

                  Your regulator's words, everywhere.

                  Air Fuse is built for five regulatory frameworks, each implementing ICAO (International Civil Aviation Organization) Annex 1 training documentation standards. Pick yours and every screen, form and certificate uses its terms.

                  Air Fuse speaks
                  AuthorityGeneral Civil Aviation Authority, United Arab EmiratesEuropean Union Aviation Safety Agency, European UnionUK Civil Aviation Authority, United KingdomFederal Aviation Administration, United StatesTransport Canada Civil Aviation, Canada
                  Organisation typeApproved Maintenance OrganisationApproved Maintenance OrganisationApproved Maintenance OrganisationCertificated Repair StationApproved Maintenance Organization
                  Organisation regulationCAR-145Part-145UK Part-14514 CFR Part 145CAR 573
                  Personnel licensingCAR-66Part-66UK Part-6614 CFR Part 65CAR 403
                  Periodic trainingContinuation trainingContinuation trainingContinuation trainingRecurrent trainingUpdate training
                  The trainee is calledTraineeTraineeTraineeTraineeApprentice
                  The supervisor is calledEngineerSupervisorSupervisorSupervisorSupervising AME
                  Logbook review is done byQA OfficerCompliance Monitoring OfficerCompliance Monitoring OfficerQuality Control InspectorQuality Assurance Manager
                  Task review is done byQuality ReviewerCompliance AuditorCompliance AuditorInspectorQuality Assurance Auditor
                  The assessor is calledAssessorAssessorAssessorEvaluatorAssessor
                  The manager is calledManagerMaintenance ManagerMaintenance ManagerDirector of MaintenancePerson Responsible for Maintenance

                  Air Fuse is built for these frameworks and designed to meet their training documentation standards.

                  Keep the system you trust.

                  Air Fuse runs the training layer beside your MRO (maintenance, repair and overhaul) system and plugs into it. Nothing gets ripped out, and your logbook history comes with you.

                  AMOS SAP Ramco Aviation Oracle IFS TRAX OASES Rusada ENVISION Ultramain Quantum Control CAMP Veryon

                  Stays in your maintenance system

                  • Work orders and task cards
                  • Aircraft and component records
                  • Parts, stores and planning

                  Runs in Air Fuse

                  • Training programmes and logbooks
                  • Signatures and role stamps
                  • Two-layer quality review
                  • Practical assessments and development plans
                  • Certificates with verification codes

                  Run something else? If it can export, Air Fuse can take it. Existing logbook history imports too, so nobody starts from page one.